APM News :: Staff Directory ::  Home     




STAFF LOGIN


Why Green....?

For Energy Management

  • State of the art, multi stage, heating and air conditioning system.

  • Advanced building energy management system installed to manage heating and cooling in down times.

  • Tightly zoned heating, air conditioning, and ventilation distribution.

  • Electric heat source chosen to minimize carbon footprint and take advantage to emerging wind energy resource.

  • Solar panels were installed for hot water.

  • High efficiency LED lighting used in lobby areas throughout.

  • LED light fixtures used for exterior wall pack lighting.

  • Energy efficient fluorescent lighting used in office areas.

  • Advanced lighting controls including timers on lighting for office areas and motion detection in washrooms.

  • Low E thermal glazing has been installed throughout.

For Thermal Efficiency

  • Enhanced thermal envelope:  Walls R-32, Roof R-40

  • P2000 insulation used in lower level

  • Lower floor constructed with front half below grade to minimize environmental exposure, and to take advantage of thermal massing.

  • Design and inspection of building envelope during construction to ensure tight weather seal.

  • Vestibules provided at main entry points to building

  • Low flow plumbing fixtures installed throughout

For Personal Comfort

  • Low VOC adhesives and finishes were selected

  • High sound and thermal resistant interior partitions and ceilings

  • Enhanced comfort zone oriented heating and air conditioning distribution system including humidity control

  • Gym and shower facilities

  • Outdoor amenity area and bike rack

 
APM Guarantee
Staff Profiles
Safety Priority
APM Clients
Client Comments
Community Work
Contact Us


3 Lower Malpeque Road
Charlottetown, PEI
C1A 1R4

Tel:  902.569.8400
Fax: 902.569.1149
info@apmconstruction.com


CLIENT LOGIN







construction managers     |     project managers      |      engineers      |      general contractors     |     design builders